Spurred on by Paul, (non of us are getting any younger), we start. Simultaneous to Bung renovations which means I will not be able to join in as much as I’d like and finances will be impossible but something will sort out, and instinctively I somehow know Paul is right. If not now, when.
The matrix of pavement slabs which have been stacked up this past year, the first £70 cost, is laid on the hardcore floor and the first oak 4 x 4 is bolted together above. The weight is spread over 24 points.



A fix of more oak from Ben Laughrel